E26 Revit Sample

The Specification

I developed the following documentation from the construction specification of a contemplation space detailed in chapter 26 of the book of Exodus. E26 is the oldest construction specification easily accessible in the English language.

The most important step to building a Revit model is understanding the model. The sharing of this document is intended to display my conservative relationship with intellectual property, my proficiency in Revit, and my ability to interpret complex construction specifications. I would rather make drawings of new concepts then redraw built work for my portfolio.

Order and Building Information molding

The beauty I find in E26 the ordered choreography of the finish, structure, insulation, cladding and footings to construct a harmoniousness datum. I enjoy the process BIM molding a process of abstracting and reconstruction our environment in such an ordered manner.

Compromise of Numbers

E26 contains compromise of the number. The proposed system fits the base 2 and 6 American stranded system harmoniously within the base 5 metric system.

The courtyard fence posts are specified at base 5 datum. The frames that structure the tent is specified at base 2. The finish and insulation curtains are specified at base 4 with an overlap align to the truss base 2 system. The total tent length is specified at 40.